trabajos grua neeb alemania
grua logistica elevacion
trabajos grua neeb alemania

Air-conditioning equipment with Spierings SK.

A large ventilator had to be lifted onto the roof of a shopping centre in Grevenbroich. Due to limited space this could only proceed with the special folding …Leer más

limpieza de edificios neeb
trabajos grua neeb
trabajos elevacion neeb

Glazing work with the Spierings SK 488.

During the building of new public utilities in Bochum replacement glass had to be installed.
By setting the boom at an angle of 30°, glass could be lowered down …Leer más

trabajos montaje neeb alemania
neeb neeb trabajos auxiliares
neeb neeb transporte pesado

Special assembly with truck mounted crane.

Lifting of a 650 kg pump assembly into a fire station with an out stretched truck mounted crane.

elevacion grua neeb
logistica elevacion grua neeb alemania

Placement of electricity substation

Mounting of a 62 t heavy electricity substation by means of a 200 t telescopic crane in Wuppertal.

trabajos elevacion alemania
grua neeb alemania
grua neeb wuppertal alemania

Garage mounting.

Mounting of two 14 ton prefabricated garages in a limited space with 90 ton telescopic crane.

grua logistica elevacion
trabajos grua neeb alemania
trabajos grua neeb alemania

Mounting of garage

Erection of 8 garages, due to big dimensions, is done by means of a 250 t telescopic crane straight over the factory building.

trabajos grua neeb alemania
trabajos grua neeb

Removal of pre-fab pavement 02/2004

Removal of pre-fab concrete pavement by means of the 180 t telescopic crane in Wuppertal.