During the building of new public utilities in Bochum replacement glass had to be installed.
By setting the boom at an angle of 30°, glass could be lowered down between the high buildings. When the boom was again horizontal, work could be carried out to the satisfaction of the client thanks to the very delicate steering even at an overlap of 38 m.

 