crane work neeb germany

Dismantling of crash barriers.

Crash barriers needed to be dismantled due to bridge building on the A1 motorway in Wuppertal. Together with an AC 40 (with smaller maximum load)and truck mounted crane …Read More

crane activities neeb germany
neeb lifting logistics
neeb crane activities germany

Air-conditioning equipment with Spierings SK.

A large ventilator had to be lifted onto the roof of a shopping centre in Grevenbroich. Due to limited space this could only proceed with the special folding …Read More

neeb crane building cleaning
crane activities neeb
crane work neeb

Glazing work with the Spierings SK 488.

During the building of new public utilities in Bochum replacement glass had to be installed.
By setting the boom at an angle of 30°, glass could be lowered down …Read More

montage neeb
neeb menial works
neeb heavy transport

Special assembly with truck mounted crane.

Lifting of a 650 kg pump assembly into a fire station with an out stretched truck mounted crane.

lifting activities crane neeb
lifting logistics neeb germany

Placement of electricity substation

Mounting of a 62 t heavy electricity substation by means of a 200 t telescopic crane in Wuppertal.

lifting activities germany
neeb crane germany
crane logistics neeb wuppertal

Garage mounting.

Mounting of two 14 ton prefabricated garages in a limited space with 90 ton telescopic crane.