Glazing work with the Spierings SK 488.
During the building of new public utilities in Bochum replacement glass had to be installed.
By setting the boom at an angle of 30°, glass could be lowered down …Read More
Special assembly with truck mounted crane.
Lifting of a 650 kg pump assembly into a fire station with an out stretched truck mounted crane.
Placement of electricity substation
Mounting of a 62 t heavy electricity substation by means of a 200 t telescopic crane in Wuppertal.
Garage mounting.
Mounting of two 14 ton prefabricated garages in a limited space with 90 ton telescopic crane.
Mounting of garage
Erection of 8 garages, due to big dimensions, is done by means of a 250 t telescopic crane straight over the factory building.
Removal of pre-fab pavement 02/2004
Removal of pre-fab concrete pavement by means of the 180 t telescopic crane in Wuppertal.