Salvage of drilling machine on the BAB 46 motorway
A 30 ton drilling machine was about to fall into the valley after crashing and therefore had to be salvaged during construction work on the A46. Due to …Read More
Mounting of a mobile radio transmitter using SK 488.
Due to fast assembly and dismantling time of the mobile folding crane the radio transmitter could be mounted within the short time approved for closing the street. Alternatively …Read More
Dismantling of crash barriers.
Crash barriers needed to be dismantled due to bridge building on the A1 motorway in Wuppertal. Together with an AC 40 (with smaller maximum load)and truck mounted crane …Read More
Air-conditioning equipment with Spierings SK.
A large ventilator had to be lifted onto the roof of a shopping centre in Grevenbroich. Due to limited space this could only proceed with the special folding …Read More
Glazing work with the Spierings SK 488.
During the building of new public utilities in Bochum replacement glass had to be installed.
By setting the boom at an angle of 30°, glass could be lowered down …Read More
Special assembly with truck mounted crane.
Lifting of a 650 kg pump assembly into a fire station with an out stretched truck mounted crane.
Placement of electricity substation
Mounting of a 62 t heavy electricity substation by means of a 200 t telescopic crane in Wuppertal.
Garage mounting.
Mounting of two 14 ton prefabricated garages in a limited space with 90 ton telescopic crane.
Mounting of garage
Erection of 8 garages, due to big dimensions, is done by means of a 250 t telescopic crane straight over the factory building.
Removal of pre-fab pavement 02/2004
Removal of pre-fab concrete pavement by means of the 180 t telescopic crane in Wuppertal.